Skip to content

Tunnel Oil station, Kasnazan

A strategically located petrol station built on mountainous terrain.

The obstacle. The primary difficulty was the severe, mountainous terrain. The land was not flat, featuring a hard, rocky slope that made standard site preparation impossible.

The approach. To conquer the terrain, the team deployed heavy-duty bulldozers and rock-breaking equipment, which levelled the ground efficiently to a buildable pad.

The result. The project's core success was in the initial earthworks and foundational engineering on the challenging slope. Completed in four months.